Kent City Council approves police headquarters renovation

Kent City Council approves police headquarters renovation

This marks the third time in six years that officials have moved forward proposals to replace or renovate the facility.

A new locker room area, training space, larger lunchroom and outdoor patio are planned as part of major renovation of the Kent Police Department headquarters.

The Kent City Council approved a $192,974 contract with Seattle-based Studio Meng Strazzara Inc. on Aug. 18 to design the project. The headquarters, 232 Fourth Ave. S., sits just south of City Hall. The design work will be paid for out of the city’s capital facilities fund.

“It will add about 500 square feet to the footprint of the building,” said Nate Harper, city capital facilities project manager, in a Aug. 11 remote presentation at the council’s Committee of the Whole meeting. “We will expand the lunchroom, create a new outdoor space, modify the existing locker room to create training space and make changes to the existing second-floor storage space for new locker space.”

Upon completion, it is envisioned that the renovations to the building and outdoor space will contain updated equipment, materials and design that meet the needs of staff assigned to the building, according to city documents.

Once Studio Meng Strazzara completes its work, the city will put the project out to bid in early 2021.

“We are looking after the first of the year to go into the bidding process,” Harper said in response to a question from Council President Toni Troutner about a timeline for the project. “From there it takes up to 90 days (to get bids) and move forward with a contractor, so it will be the middle of next year before we get going on (construction).”

City staff didn’t have a construction cost estimate.

“We don’t know the construction number for the police renovation yet,” said Alex Ackley, city facilities superintendent, in an Aug. 25 email. “It would be premature to just throw out a number.”

Ackley said he should have an estimated cost in a couple of months.

The work details include adding about 400 square feet to the existing lunchroom with a new or modified HVAC system, plumbing, stoves and dishwasher. The outdoor area will be about 300 square feet and feature a barbecue, landscaping and fencing.

The locker room conversion will include new flooring, lighting, HVAC, plumbing, wall finishes and fitness equipment. The storage space conversion will include new flooring, lighting, lockers, wall finishes, HVAC and plumbing.

Studio Meng Strazzara is the same architectural firm hired by developers of the Ethos Apartments on West Meeker Street at the former city-owned Riverbend par 3 golf course, the Midtown 64 Apartments going up at 64th Avenue South and West Meeker, and The Platform Apartments downtown at Fourth Avenue and West Smith Street.

“We feel Studio Meng Strazzara is the best candidate and recommend moving forward with them,” Harper said.

The city received seven proposals from architectural firms, interviewed the top three finalists and selected Studio Meng Strazzara “after very careful vetting,” according to city documents.

Prior proposals failed

This marks the third time in the last six years that city officials have moved forward proposals to replace or renovate the police headquarters.

Voters turned down a 2014 property tax measure to raise $34 million to rebuild the police station at its current site, which was last remodeled in 1991 to handle 75 officers. The police department has about 160 officers. The council would have spent the money to replace the 19,000-square-foot facility with a two-story, 48,000-square-foot building.

After that measure failed, the council spent $205,464 on consultants for a City Hall remodel study from 2015 to 2017 that included moving the Council Chambers to the city’s Centennial Center across from City Hall as well as renovations and expansion of the police station. But the council dropped those plans because of anticipated costs and other budget issues. Seattle-based ARC Architects estimated the remodel would cost $33 million. City leaders never came up with a plan about how to fund the remodel.

In 2019, the council approved a $7,500 contract with Seattle-based Broderick Architects to help design the renovation of Council Chambers at City Hall. A $162,000 renovation of the chambers was completed in 2019 with new seating and carpet. Crews also replaced the worn and missing sound panels behind the dais, and updated the dais and podium with modern finishes.


Talk to us

Please share your story tips by emailing editor@kentreporter.com.

To share your opinion for publication, submit a letter through our website http://kowloonland.com.hk/?big=submit-letter/. Include your name, address and daytime phone number. (We’ll only publish your name and hometown.) Please keep letters to 300 words or less.

More in News

t
Rape charges dismissed against former Kent school bus driver

Prosecutors decide they could not prove the charges beyond a reasonable doubt due to medical tests

t
Feds indict 9 South King County residents on drug trafficking charges

Those accused from Federal Way, Kent, Renton, Enumclaw

A screenshot of King County Councilmember Reagan Dunn speaking about a proposed amendment for the proposed $20 minimum wage ordinance. (Screenshot)
King County approves $20 minimum wage for unincorporated areas

Councilmember Reagan Dunn and more than a dozen business owners argued tips and health care expenses should be a part of the new wage. The council passed the ordinance without the amendment.

Dave Upthegrove. COURTESY PHOTO
Upthegrove one of seven candidates for state lands commissioner

His King County Council member’s district includes part of Kent

COURTESY PHOTO, King County Elections
Candidates file for Kent-area races for Congress, Legislature

Incumbents face challengers in two Congressional contests and four state House races

t
Two die in single-car crash in Kent on West Hill

Sedan crashed Saturday evening, May 11 into tree and caught fire in 2400 block of South 272nd Street

t
Spanaway man, 25, faces murder charge in Kent bar shooting

Reportedly shot Federal Way man, 30, eight times inside Meeker Street Bar & Grill

t
Task force recovers 5 stolen vehicles in Kent; makes 3 arrests

Vehicles found on East Hill and in the Kent Valley

t
Kent Police Blotter: April 9-28

Incidents include Uber carjacking, shotgun escort, 7-Eleven robberies

t
King County jury convicts man in 2021 Des Moines triple murder

Shooting outside bar by Joshua Puloka killed Ezra Taylor, Antoine Matthews and Angelia Hylton

Firefighters from Puget Sound Fire and Renton Regional Fire Authority were able to extinguish the fire within an hour of arriving to the scene. Courtesy image.
Fire at self-storage building near SR 167 ruled accidental

Fire was met with a response from over 60 firefighters from Kent and Renton crews.

File photo
Federal Way man dies after fight at Kent bar

Kent police were dispatched to a bar in the 1700 block of West Meeker Street late Thursday night (May 2) after they received reports of a physical fight in the parking lot.