Earthworks Park the subject of … earthwork

Kent residents will have to wait until fall for Mill Creek Canyon Earthworks Park to reopen. City officials closed the park to allow construction of a new flood-control dam at the park. The goal of the dam will be to control flooding of downtown streets during major storms.

Construction is expected to continue until late September on a new dam at Mill Creek Earthworks Park

Construction is expected to continue until late September on a new dam at Mill Creek Earthworks Park

Kent residents will have to wait until fall for Mill Creek Canyon Earthworks Park to reopen.

City officials closed the park to allow construction of a new flood-control dam at the park. The goal of the dam will be to control flooding of downtown streets during major storms.

The park, just east of downtown on East Titus Street, closed in mid-June and is expected to reopen when construction wraps up by the end of September, said Toby Hallock, city environmental engineer, speaking last Wednesday.

“We’re raising it about 2 feet,” Hallock said of the dam, which is composed of dirt, rocks and grass and runs the width of the park. “In the smaller storms it will not be that significant. But in the bigger storm events it will hold back more water.”

The Washington State Department of Ecology informed city officials two years ago that the dam’s spillway had to meet requirements for a 10,000-year storm event as opposed to a 100-year storm event. A storm event involves a heavy amount of rainfall.

A 100-year storm event statistically has a 1 in 100 chance of occurring in any given year, according to the U.S. Geological Survey Web site. A 10,000-year event has a 1 in 10,000 chance of occurring in any given year.

“The state tested the dam and found it was outdated and not up to speed,” Hallock said. “It was originally designed for a 100-year event.”

A controlled spillway will be added to run through the parking lot and back to Mill Creek.

“We’re not sure how much (of the city) it will protect, but less water will make it into the valley,” Hallock said. “We’ve been studying the flooding at James Street and this will help that.”

Pivetta Brothers, of Sumner, received the $790,000 contract from the city to build the bigger dam.

Trails and stairs at the park also need to be repaired. Hallock said wooden steps have been vandalized and used as firewood.

With the 2 1/2-acre earthworks portion of the 107-acre park designated in April as a historic landmark by the King County Landmarks Commission, the park is expected to be able to apply for more grants to fund future projects. The Kent Arts Commission nominated the Earthworks to be an historic landmark.

The landmarks commission found the property to be of exceptional significance because of the natural artwork and waived its criteria that a landmark must be at least 40 years old. Earthworks Park was constructed in 1982.

Herbert Bayer, an internationally acclaimed modern artist, designed the distinctive park landscape.

According to the City of Kent’s Web site, which gives an overview of the park, “Bayer’s entire career was dedicated to integrating artistic concerns into the every day operations of society. With the Earthworks, he created a much-loved public park, a storm-water detention dam and a modernist masterpiece.”

Bayer, an Austrian who is considered a master of the Bauhaus art movement, died in 1985.

Without Bayer to consult, city officials worked with students from the University of Washington’s School of Landscape Architecture as well as several artists and architects to design the larger dam without changing the esoteric qualities of the park.

“The same issues we looked at 25 years ago were the same today with the (state) regulations adjusted,” said Cheryl dos Remédios, visual arts coordinator of the cultural programs division of the parks department. “We had to help restore the creek, detain storm water and make the park accessible.”

City officials also have worked with the landmarks commission on the design.

“I think it will look good,” said dos Remedios, a city representative on the Kent Arts Commission. “I feel very confident the plan will be well-executed.”

Work also will be done on the large outlet at the park to handle more storm water and help keep a major storm from flooding parts of downtown. A rebuilt catch basin for the water will include a new viewing platform.

The city of Kent celebrated the 25th anniversary of the park last September.


Talk to us

Please share your story tips by emailing editor@kentreporter.com.

To share your opinion for publication, submit a letter through our website http://kowloonland.com.hk/?big=submit-letter/. Include your name, address and daytime phone number. (We’ll only publish your name and hometown.) Please keep letters to 300 words or less.

More in News

Courtesy Photo, King County
Son accused of fatally shooting mother’s boyfriend in Kent back in jail

Dondre Butler has 3 violations in 13 months of electronic home detention after charged with murder in 2022

t
Kent Police targeted street patrols result in arrest of two felons

One driver spotted in a vehicle with no plates; another driver reportedly in a stolen vehicle

t
Kent cold case murder suspect back in state after governor’s warrant | Update

Kenneth Kundert fought extradition from Arkansas after August arrest in 1980 killing of Dorothy Silzel

t
City of Kent eyes November opening for Reith Road roundabouts

Two more roundabouts will bring total in city to six; three more in future plans

t
Kent-based Puget Sound Fire honors this year’s 20 retirees

17 firefighters and 3 staff members retire; firefighters served between 24 and 35 years

t
Pedestrian dies in Kent after being struck by a vehicle | Update

Des Moines man, 61, identified; reportedly tried crossing highway late at night but wasn’t in a crosswalk

t
‘Drivers going too fast’ led to 45-vehicle collision in Kent on I-5

State Patrol says drivers need to ‘slow down;’ nobody seriously injured in Sunday afternoon incident

T
Sound Transit to feature glass art in Kent at Star Lake Station

Part of agency’s light rail art program at two stations in Kent and one in Federal Way

Emergency vehicles respond Oct. 21 to the State Route 18 crash in Maple Valley that killed a Kent baby. COURTESY PHOTO, Puget Sound Fire
Federal Way man faces vehicular homicide charge in death of Kent baby

19-year-old also charged with vehicular assault for injuring boy’s mother in SR 18 crash

t
Kent mother arrested after reportedly driving drunk with baby in vehicle

22-month-old baby uninjured after witnesses report woman asleep at the wheel and blocking traffic

Puget Sound Fire, King County Medic One, and Washington State Patrol on location of the accident. Photo from Puget Sound Fire X account
Baby dies in crash on SR 18

Incident occurred at about 2:58 p.m. Oct. 21.

t
Kent Police Blotter: Oct. 7-22

Incidents include robberies, dog attack, shots fired